BEGIN:VCALENDAR
VERSION:2.0
METHOD:PUBLISH
PRODID:-//Telerik Inc.//Sitefinity CMS 15.4//EN
BEGIN:VTIMEZONE
TZID:Central Standard Time
BEGIN:STANDARD
DTSTART:20251102T020000
RRULE:FREQ=YEARLY;BYDAY=1SU;BYHOUR=2;BYMINUTE=0;BYMONTH=11
TZNAME:Central Standard Time
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
END:STANDARD
BEGIN:DAYLIGHT
DTSTART:20250301T020000
RRULE:FREQ=YEARLY;BYDAY=2SU;BYHOUR=2;BYMINUTE=0;BYMONTH=3
TZNAME:Central Daylight Time
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VEVENT
DESCRIPTION:The Florida Department of Transportation (FDOT) will hold a pub
 lic information meeting for work beginning on State Road 95 (U.S. 29/Pensa
 cola Boulevard)\, from Interstate 10 (I-10) to north of S.R. 10 (U.S. 90A/
 Nine Mile Road) in Escambia County. The meeting will be held Thursday\, Au
 g. 25\, 2016 from 5:30 p.m. to 6:30 p.m. CDT at Smyrna Baptist Church\, 70
 00 Pensacola Boulevard\, Pensacola.&nbsp\;&nbsp\; \nThe $48.9 million proj
 ect includes widening U.S. 29 (Pensacola Boulevard)\, from&nbsp\; I-10 to 
 north of Nine Mile Road from four to six travel lanes.&nbsp\; Additional i
 mprovements include replacing the bridge over Nine Mile Road\, roadway lig
 hting\, sidewalks\, bike lanes\, signalization improvements\, and drainage
  upgrades. FDOT representatives&nbsp\; will be available to provide inform
 ation about planned construction work and potential impacts.\nConstruction
  activities are scheduled to begin in September 2016 and will require nigh
 ttime lane closures and speed limit reductions on Pensacola Boulevard. Wea
 ther permitting\, the project is slated for completion summer 2020.&nbsp\;
 \nPublic participation is solicited without regard to race\, color\, natio
 nal origin\, age\, sex\, religion\, disability or family status.&nbsp\; Pe
 rsons who require special accommodations under the Americans with Disabili
 ties Act or persons who require translation services (free of charge) shou
 ld contact Georgina Acierto-Kent\, P.E.\, FDOT Project Manager\, at (850) 
 981-2804 at least seven days prior to the meeting.&nbsp\;\nFor more inform
 ation\, follow the project on Facebook at www.facebook.com/MyUS29 or FDOT 
 District Three on Twitter @myfdot_nwfl and www.facebook.com/MyFDOTNWFL.
DTEND:20160825T233000Z
DTSTAMP:20260930T231848Z
DTSTART:20160825T223000Z
LOCATION:7000 Pensacola Blvd., Pensacola
SEQUENCE:0
SUMMARY:FDOT Public Information Meeting Scheduled for U.S. 29 Widening Proj
 ect
UID:RFCALITEM639264071287837508
X-ALT-DESC;FMTTYPE=text/html:<p>The Florida Department of Transportation (F
 DOT) will hold a public information meeting for work beginning on State Ro
 ad 95 (U.S. 29/Pensacola Boulevard)\, from Interstate 10 (I-10) to north o
 f S.R. 10 (U.S. 90A/Nine Mile Road) in Escambia County. The meeting will b
 e held Thursday\, Aug. 25\, 2016 from 5:30 p.m. to 6:30 p.m. CDT at Smyrna
  Baptist Church\, 7000 Pensacola Boulevard\, Pensacola.&nbsp\;&nbsp\; </p>
 \n<p><span style="line-height: 1.5\;">The $48.9 million project includes w
 idening U.S. 29 (Pensacola Boulevard)\, from&nbsp\; I-10 to north of Nine 
 Mile Road from four to six travel lanes.&nbsp\; Additional improvements in
 clude replacing the bridge over Nine Mile Road\, roadway lighting\, sidewa
 lks\, bike lanes\, signalization improvements\, and drainage upgrades. FDO
 T representatives&nbsp\; will be available to provide information about pl
 anned construction work and potential impacts.</span></p>\n<p><span style=
 "line-height: 1.5\;">Construction activities are scheduled to begin in Sep
 tember 2016 and will require nighttime lane closures and speed limit reduc
 tions on Pensacola Boulevard. Weather permitting\, the project is slated f
 or completion summer 2020.&nbsp\;</span></p>\n<p><span style="line-height:
  1.5\;">Public participation is solicited without regard to race\, color\,
  national origin\, age\, sex\, religion\, disability or family status.&nbs
 p\; Persons who require special accommodations under the Americans with Di
 sabilities Act or persons who require translation services (free of charge
 ) should contact Georgina Acierto-Kent\, P.E.\, FDOT Project Manager\, at 
 (850) 981-2804 at least seven days prior to the meeting.&nbsp\;</span></p>
 \n<p><span style="line-height: 1.5\;">For more information\, follow the pr
 oject on Facebook at </span><a href="http://www.facebook.com/MyUS29" style
 ="line-height: 1.5\;">www.facebook.com/MyUS29</a><span style="line-height:
  1.5\;"> or FDOT District Three on Twitter @myfdot_nwfl and </span><a href
 ="http://www.facebook.com/MyFDOTNWFL" style="line-height: 1.5\;">www.faceb
 ook.com/MyFDOTNWFL</a><span style="line-height: 1.5\;">.</span></p>
END:VEVENT
END:VCALENDAR
