BEGIN:VCALENDAR
VERSION:2.0
METHOD:PUBLISH
PRODID:-//Telerik Inc.//Sitefinity CMS 15.4//EN
BEGIN:VTIMEZONE
TZID:Central Standard Time
BEGIN:STANDARD
DTSTART:20251102T020000
RRULE:FREQ=YEARLY;BYDAY=1SU;BYHOUR=2;BYMINUTE=0;BYMONTH=11
TZNAME:Central Standard Time
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
END:STANDARD
BEGIN:DAYLIGHT
DTSTART:20250301T020000
RRULE:FREQ=YEARLY;BYDAY=2SU;BYHOUR=2;BYMINUTE=0;BYMONTH=3
TZNAME:Central Daylight Time
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VEVENT
DESCRIPTION:The purpose of this Florida Department of Transporation project
  is to study the widening from four lanes to six lanes of S.R. 10 (U.S. 90
 ) through Escambia and Santa Rosa counties to provide additional east-west
  capacity alternatives to Interstate 10 (I-10). S.R. 10 (U.S. 90) serves a
 s a connecting link between the City of Pensacola\, the community of Pace\
 , and the City of Milton. The western segment directly connects with I-10 
 and is in close proximity to the main University of West Florida campus en
 trance at Campus Drive. The eastern segment connects with S.R. 281 (Avalon
  Boulevard)\, which connects to I-10\, and also connects with S.R. 87 and 
 S.R. 89\, both of which extend north into Alabama.\n\nAdditional roadway c
 apacity is needed to strengthen S.R. 10 (U.S. 90) as an east-west corridor
  alternative to I-10 that will accommodate the projected future roadway vo
 lumes for motorists traveling between Escambia and Santa Rosa counties and
  for emergency evacuation purposes.\n\nThis meeting is to present the init
 ial engineering and environmental annalists to date and give the public an
  opportunity to provide comments concerning proposed improvements.&nbsp\;
DTEND:20161207T003000Z
DTSTAMP:20261001T000547Z
DTSTART:20161206T233000Z
LOCATION:4530 Spikes Way, Milton
SEQUENCE:0
SUMMARY:FDOT U.S. 90 Project Development and Environment Study Public Meeti
 ng
UID:RFCALITEM639264099470754271
X-ALT-DESC;FMTTYPE=text/html:The purpose of this Florida Department of Tran
 sporation project is to study the widening from four lanes to six lanes of
  S.R. 10 (U.S. 90) through Escambia and Santa Rosa counties to provide add
 itional east-west capacity alternatives to Interstate 10 (I-10). S.R. 10 (
 U.S. 90) serves as a connecting link between the City of Pensacola\, the c
 ommunity of Pace\, and the City of Milton. The western segment directly co
 nnects with I-10 and is in close proximity to the main University of West 
 Florida campus entrance at Campus Drive. The eastern segment connects with
  S.R. 281 (Avalon Boulevard)\, which connects to I-10\, and also connects 
 with S.R. 87 and S.R. 89\, both of which extend north into Alabama.<br />\
 n<br />\nAdditional roadway capacity is needed to strengthen S.R. 10 (U.S.
  90) as an east-west corridor alternative to I-10 that will accommodate th
 e projected future roadway volumes for motorists traveling between Escambi
 a and Santa Rosa counties and for emergency evacuation purposes.<br />\n<b
 r />\nThis meeting is to present the initial engineering and environmental
  annalists to date and give the public an opportunity to provide comments 
 concerning proposed improvements.&nbsp\;
END:VEVENT
END:VCALENDAR
