BEGIN:VCALENDAR
VERSION:2.0
METHOD:PUBLISH
PRODID:-//Telerik Inc.//Sitefinity CMS 15.4//EN
BEGIN:VTIMEZONE
TZID:Central Standard Time
BEGIN:STANDARD
DTSTART:20251102T020000
RRULE:FREQ=YEARLY;BYDAY=1SU;BYHOUR=2;BYMINUTE=0;BYMONTH=11
TZNAME:Central Standard Time
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
END:STANDARD
BEGIN:DAYLIGHT
DTSTART:20250301T020000
RRULE:FREQ=YEARLY;BYDAY=2SU;BYHOUR=2;BYMINUTE=0;BYMONTH=3
TZNAME:Central Daylight Time
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VEVENT
DESCRIPTION:The media and the public are invited on to a ribbon-cutting cer
 emony Friday\, May 21 at 1 p.m. for Olive Road at the parking lot near the
  retention pond located at 7965 Kipling St. COVID-19 precautions are being
  taken so&nbsp\;please RSVP at&nbsp\;https://bit.ly/3nKM8u5&nbsp\;by Wedne
 sday\, May 19.&nbsp\;The county plans to stream the event on YouTube.&nbsp
 \;This ribbon-cutting is rescheduled from Wednesday\, April 14.\n\nSpeaker
 s will include:\nChairman and District 4 Escambia County Commissioner Robe
 rt Bender&nbsp\;\nCity of Pensacola Mayor Grover Robinson\n(One or more Es
 cambia County Board of County Commissioners may be in attendance)\nImprove
 ments include:\n\n    The roadway is an upgrade from a rural two-lane road
 way to an urban three-lane roadway.\n    The realignment and signalization
  of the Johnson Avenue at Harbour Square Drive intersection was a major sa
 fety upgrade.\n    Drainage improvements\, including retention ponds\, wil
 l reduce current flooding occurrences and allow for future drainage projec
 t connections. The Ferry Pass community will benefit from the fifth draina
 ge project now that the drainage on Olive Road has been upgraded (Ferry Pa
 ss Zone 5\, Boyd Avenue from Raines Street to East Olive Road drainage tie
 -in). This project will pick back up in design very soon.\n    Sidewalk in
 stallation with handrails provides increased pedestrian safety.\n    There
  are ADA compliant curb ramps and other accessibility improvements.\n    N
 ew asphalt and striping increases vehicle safety\, with increased visibili
 ty and provides for bicycle lanes.\n    The traffic signals at 9th&nbsp\;A
 venue and Johnson Avenue at Olive Road have been integrated into the Traff
 ic Signal Operation Center (TSOC) which will improve traffic monitoring an
 d safety.\n    The parking lot was recently finished in February 2021 for 
 people who want to use the walking track around the retention pond.\n\n
DTEND:20210521T190000Z
DTSTAMP:20260910T142333Z
DTSTART:20210521T180000Z
LOCATION:7965 Kipling St., Pensacola
SEQUENCE:0
SUMMARY:Ribbon-Cutting for Olive Road
UID:RFCALITEM639246470135781178
X-ALT-DESC;FMTTYPE=text/html:<p>The media and the public are invited on to 
 a ribbon-cutting ceremony Friday\, May 21 at 1 p.m. for Olive Road at the 
 parking lot near the retention pond located at 7965 Kipling St. COVID-19 p
 recautions are being taken so&nbsp\;<a href="https://www.eventbrite.com/e/
 ribbon-cutting-for-olive-road-tickets-153518464861"></a><a href="https://w
 ww.eventbrite.com/e/ribbon-cutting-for-olive-road-tickets-153518464861">pl
 ease RSVP at&nbsp\;https://bit.ly/3nKM8u5</a>&nbsp\;by Wednesday\, May 19.
 &nbsp\;<a href="https://www.youtube.com/c/EscambiaCountyTV98">The county p
 lans to stream the event on YouTube.</a>&nbsp\;<a href="https://www.youtub
 e.com/c/EscambiaCountyTV98"></a><a href="https://www.youtube.com/c/Escambi
 aCountyTV98"></a><a href="http://https//www.youtube.com/c/EscambiaCountyTV
 98"></a>This ribbon-cutting is rescheduled from Wednesday\, April 14.<br /
 >\n<br />\nSpeakers will include:<br />\nChairman and District 4 Escambia 
 County Commissioner Robert Bender&nbsp\;<br />\nCity of Pensacola Mayor Gr
 over Robinson<br />\n(One or more Escambia County Board of County Commissi
 oners may be in attendance)</p>\n<p>Improvements include:</p>\n<ul>\n    <
 li>The roadway is an upgrade from a rural two-lane roadway to an urban thr
 ee-lane roadway.</li>\n    <li>The realignment and signalization of the Jo
 hnson Avenue at Harbour Square Drive intersection was a major safety upgra
 de.</li>\n    <li>Drainage improvements\, including retention ponds\, will
  reduce current flooding occurrences and allow for future drainage project
  connections. The Ferry Pass community will benefit from the fifth drainag
 e project now that the drainage on Olive Road has been upgraded (Ferry Pas
 s Zone 5\, Boyd Avenue from Raines Street to East Olive Road drainage tie-
 in). This project will pick back up in design very soon.</li>\n    <li>Sid
 ewalk installation with handrails provides increased pedestrian safety.</l
 i>\n    <li>There are ADA compliant curb ramps and other accessibility imp
 rovements.</li>\n    <li>New asphalt and striping increases vehicle safety
 \, with increased visibility and provides for bicycle lanes.</li>\n    <li
 >The traffic signals at 9<sup>th</sup>&nbsp\;Avenue and Johnson Avenue at 
 Olive Road have been integrated into the Traffic Signal Operation Center (
 TSOC) which will improve traffic monitoring and safety.</li>\n    <li>The 
 parking lot was recently finished in February 2021 for people who want to 
 use the walking track around the retention pond.</li>\n</ul>\n<img src="ht
 tps://myescambia.com/images/default-source/default-album/eced_social_ribbo
 n-cutting_olive-road.jpg?sfvrsn=c1a94e6f_0&amp\;sf_site_temp=true&amp\;sf_
 site=00000000-0000-0000-0000-000000000000&amp\;MaxWidth=600&amp\;MaxHeight
 =&amp\;ScaleUp=false&amp\;Quality=High&amp\;Method=ResizeFitToAreaArgument
 s&amp\;Signature=11BA06D6F7521A174896D900F0D65D99DA209589" data-method="Re
 sizeFitToAreaArguments" data-customsizemethodproperties="{'MaxWidth':'600'
 \,'MaxHeight':''\,'ScaleUp':false\,'Quality':'High'}" data-displaymode="Cu
 stom" alt="ECED_social_ribbon cutting_Olive Road" title="ECED_social_ribbo
 n cutting_Olive Road" />
END:VEVENT
END:VCALENDAR
