BEGIN:VCALENDAR
VERSION:2.0
METHOD:PUBLISH
PRODID:-//Telerik Inc.//Sitefinity CMS 15.4//EN
BEGIN:VTIMEZONE
TZID:Central Standard Time
BEGIN:STANDARD
DTSTART:20251102T020000
RRULE:FREQ=YEARLY;BYDAY=1SU;BYHOUR=2;BYMINUTE=0;BYMONTH=11
TZNAME:Central Standard Time
TZOFFSETFROM:-0500
TZOFFSETTO:-0600
END:STANDARD
BEGIN:DAYLIGHT
DTSTART:20250301T020000
RRULE:FREQ=YEARLY;BYDAY=2SU;BYHOUR=2;BYMINUTE=0;BYMONTH=3
TZNAME:Central Daylight Time
TZOFFSETFROM:-0600
TZOFFSETTO:-0500
END:DAYLIGHT
END:VTIMEZONE
BEGIN:VEVENT
DESCRIPTION:Due to heavy rain in the forecast\, this event will be postpone
 d. Another announcement will be distributed with the new date.&nbsp\;\nThe
  media and the public are invited on Wednesday\, April 14 at 2:30 p.m. to 
 a ribbon-cutting ceremony for Olive Road at the parking lot near the reten
 tion pond located at 7965 Kipling St. COVID-19 precautions are being taken
  so please RSVP at https://bit.ly/3wxKEqX&nbsp\;by Monday\, April 12.\n\nS
 peakers will include:\nChairman and District 4 Escambia County Commissione
 r Robert Bender&nbsp\;\nCity of Pensacola Mayor Grover Robinson\n(One or m
 ore Escambia County Board of County Commissioners may be in attendance)\nI
 mprovements include:\n\n    The roadway is an upgrade from a rural two-lan
 e roadway to an urban three-lane roadway.\n    The realignment and signali
 zation of the Johnson Avenue at Harbour Square Drive intersection was a ma
 jor safety upgrade.\n    Drainage improvements\, including retention ponds
 \, will reduce current flooding occurrences and allow for future drainage 
 project connections. The Ferry Pass community will benefit from the fifth 
 drainage project now that the drainage on Olive Road has been upgraded (Fe
 rry Pass Zone 5\, Boyd Avenue from Raines Street to East Olive Road draina
 ge tie-in). This project will pick back up in design very soon.\n    Sidew
 alk installation with handrails provides increased pedestrian safety.\n   
  There are ADA compliant curb ramps and other accessibility improvements.\
 n    New asphalt and striping increases vehicle safety\, with increased vi
 sibility and provides for bicycle lanes.\n    The traffic signals at 9th A
 venue and Johnson Avenue at Olive Road have been integrated into the Traff
 ic Signal Operation Center (TSOC) which will improve traffic monitoring an
 d safety.\n    The parking lot was recently finished in February 2021 for 
 people who want to use the walking track around the retention pond.\n\n
DTEND:20210414T203000Z
DTSTAMP:20260704T091854Z
DTSTART:20210414T193000Z
LOCATION:7965 Kipling St., Pensacola
SEQUENCE:0
SUMMARY:(Postponed) Ribbon-Cutting for Olive Road 
UID:RFCALITEM639187535348126002
X-ALT-DESC;FMTTYPE=text/html:<p><span style="background-color: #ffff00\;">D
 ue to heavy rain in the forecast\, this event will be postponed. Another a
 nnouncement will be distributed with the new date.&nbsp\;</span></p>\n<p>T
 he media and the public are invited on Wednesday\, April 14 at 2:30 p.m. t
 o a ribbon-cutting ceremony for Olive Road at the parking lot near the ret
 ention pond located at 7965 Kipling St. COVID-19 precautions are being tak
 en so <a href="https://bit.ly/3wxKEqX">please RSVP at </a><a href="http://
 myescambia.com/aa88ee3c-d13d-4751-ba3f-7538ecc6b2ca?sf=30A9B16AF6AEhttps%3
 a%2f%2fbit.ly%2f3wxKEqX&amp\;c=k0E5kbyfiv2uUK2dMJ5cwvSSy7Y%3d">https://bit
 .ly/3wxKEqX</a>&nbsp\;by Monday\, April 12.<br />\n<br />\nSpeakers will i
 nclude:<br />\nChairman and District 4 Escambia County Commissioner Robert
  Bender&nbsp\;<br />\nCity of Pensacola Mayor Grover Robinson<br />\n(One 
 or more Escambia County Board of County Commissioners may be in attendance
 )</p>\n<p>Improvements include:</p>\n<ul style="list-style-type: disc\;">\
 n    <li>The roadway is an upgrade from a rural two-lane roadway to an urb
 an three-lane roadway.</li>\n    <li>The realignment and signalization of 
 the Johnson Avenue at Harbour Square Drive intersection was a major safety
  upgrade.</li>\n    <li>Drainage improvements\, including retention ponds\
 , will reduce current flooding occurrences and allow for future drainage p
 roject connections. The Ferry Pass community will benefit from the fifth d
 rainage project now that the drainage on Olive Road has been upgraded (Fer
 ry Pass Zone 5\, Boyd Avenue from Raines Street to East Olive Road drainag
 e tie-in). This project will pick back up in design very soon.</li>\n    <
 li>Sidewalk installation with handrails provides increased pedestrian safe
 ty.</li>\n    <li>There are ADA compliant curb ramps and other accessibili
 ty improvements.</li>\n    <li>New asphalt and striping increases vehicle 
 safety\, with increased visibility and provides for bicycle lanes.</li>\n 
    <li>The traffic signals at 9<sup>th</sup> Avenue and Johnson Avenue at 
 Olive Road have been integrated into the Traffic Signal Operation Center (
 TSOC) which will improve traffic monitoring and safety.</li>\n    <li>The 
 parking lot was recently finished in February 2021 for people who want to 
 use the walking track around the retention pond.</li>\n</ul>\n<img src="ht
 tps://myescambia.com/images/default-source/default-album/eced_ribbon-cutti
 ng-olive-road_1200x630.jpg?sfvrsn=b518686f_0&amp\;sf_site_temp=true&amp\;s
 f_site=00000000-0000-0000-0000-000000000000&amp\;MaxWidth=600&amp\;MaxHeig
 ht=&amp\;ScaleUp=false&amp\;Quality=High&amp\;Method=ResizeFitToAreaArgume
 nts&amp\;Signature=44C68311074C58A695B769305C5EB35A99BBDC86" data-method="
 ResizeFitToAreaArguments" data-customsizemethodproperties="{'MaxWidth':'60
 0'\,'MaxHeight':''\,'ScaleUp':false\,'Quality':'High'}" data-displaymode="
 Custom" alt="ECED_ribbon cutting Olive Road_1200x630" title="ECED_ribbon c
 utting Olive Road_1200x630" />
END:VEVENT
END:VCALENDAR
